If you free download the demos of our LEED-AP-BD-C study guide to have a try, then you will find that rather than solely theory-oriented, our LEED-AP-BD-C actual exam provides practice atmosphere when you download them, you can practice every day just like answering on the real LEED-AP-BD-C Practice Exam. We can help you demonstrate your personal ability and our LEED-AP-BD-C exam materials are the product you cannot miss.
USGBC LEED-AP-BD-C Exam Syllabus Topics:
Topic
Details
Topic 1
Topic 2
Topic 3
Topic 4
Topic 5
Topic 6
>> Reliable LEED-AP-BD-C Test Sims <<
LEED-AP-BD-C Questions Answers & New LEED-AP-BD-C Dumps Book
The DumpsFree wants to help students ace the certification exam preparation. To achieve this goal the DumpsFree is offering real, valid, and updated exam questions in three different formats. These USGBC LEED-AP-BD-C exam questions formats are PDF file, desktop practice test software, and web-based practice test software. All these three LEED-AP-BD-C Exam Practice question formats are easy to use. The LEED-AP-BD-C desktop practice test software and web-based practice test software both are the easy-to-use mock LEED AP Building Design + Construction (LEED AP BD+C) (LEED-AP-BD-C) exam. These LEED-AP-BD-C mock exams are designed to simulate the conditions of a real exam.
USGBC LEED AP Building Design + Construction (LEED AP BD+C) Sample Questions (Q263-Q268):
NEW QUESTION # 263
To achieve the Sustainable Sites Credit, Light Pollution Reduction, Option 1. BUG Rating Method, projects must demonstrate:
Answer: B
Explanation:
Detailed Explanation:
Under the BUG Rating Method, all luminaires must meet acceptable fixture ratings (Backlight, Uplight, and Glare ratings) for the project's Model Lighting Ordinance (MLO) lighting zone. This ensures compliance with LEED's Light Pollution Reduction credit by limiting light trespass, reducing glare, and preserving night sky quality.
NEW QUESTION # 264
What is the sequence of the process for LEED certification?
Answer: D
Explanation:
The correct sequence for LEED certification is: Choose Rating System, Register, Submit documentation through LEED Online, Review, Certify (C). Projects begin by selecting the appropriate LEED rating system, then register with USGBC, followed by documentation submission for review. After review, certification is granted based on achieved points. This structured approach ensures accurate and consistent compliance with LEED standards.
NEW QUESTION # 265
Which of the following is required for a cooling tower or evaporative condenser in Water Efficiency Prerequisite, Indoor Water Use Reduction?
Answer: D
Explanation:
Explanation
Makeup water meters, conductivity controllers and overflow alarms
According to the Water Efficiency Prerequisite for Indoor Water Use Reduction, cooling towers and evaporative condensers must be equipped with makeup water meters, conductivity controllers and overflow alarms to reduce water consumption and prevent water waste. These devices help monitor and control the water quality, flow rate and level of the cooling system, and alert the operators of any malfunctions or leaks.
References: As per the LEED AP Building Design + Construction (LEED AP BD+C) V4 resources, the installation of makeup water meters, conductivity controllers and overflow alarms is a requirement for cooling towers and evaporative condensers under the Water Efficiency Prerequisite for Indoor Water Use Reduction.
This prerequisite aims to reduce indoor water consumption by setting baseline and efficiency standards for fixtures, fittings, appliances, equipment and processes. For cooling towers and evaporative condensers, the prerequisite also requires efficient drift eliminators that reduce drift to a maximum of 0.002% of recirculated water volume for counterflow towers and 0.005% of recirculated water flow for cross-flow towers. For more detailed information, you can refer to the web-based reference guide in the credit library at USGBC's official website.
NEW QUESTION # 266
The design team has specified products to achieve Materials and Resources Credit: Building Product Disclosure and Optimization - Sourcing of Raw Materials, Option 2. Leadership Extraction Practices for the project. At the end of the construction, it was discovered that the transporter who shipped a portion of the wood did not have chain-of-custody (CoC) certification. The design team should do which of the following?
Answer: B
Explanation:
If a transporter lacks chain-of-custody (CoC) certification for certified wood products, the design team should recalculate the percentage of certified wood and classify the affected wood as non-certified (B). This approach follows LEED's requirements for accurate reporting on certified materials. LEED requires all certified wood to maintain CoC certification from the forest to the project site, so any deviation affects credit calculations. Submitting a CIR (A) isn't needed as the LEED rules are clear on this matter, and removal (D) may not be feasible or cost-effective.
NEW QUESTION # 267
What standard should an engineer use when establishing minimum ventilation rates for a new mechanically ventilated space to earn Indoor Environmental Quality, Minimum Indoor Air Quality Performance?
Answer: B
Explanation:
ASHRAE 62.1-2010 is the standard that an engineer should use when establishing minimum ventilation rates for a new mechanically ventilated space to earn Indoor Environmental Quality, Minimum Indoor Air Quality Performance. This is the standard referenced by the LEED v4 BD+C Reference Guide for this prerequisite.
Local building code, International Mechanical Code 2012, and the ventilation code requiring the greatest volume of outside air are not acceptable alternatives for this prerequisite.References: LEED v4 BD+C Reference Guide, Indoor Environmental Quality Category, EQp Minimum Indoor Air Quality Performance, page 674.
NEW QUESTION # 268
......
As is known to us, people who want to take the LEED-AP-BD-C exam include different ages, different fields and so on. It is very important for company to design the LEED-AP-BD-C study materials suitable for all people. However, our company has achieved the goal. We can promise that the LEED-AP-BD-C Study Materials from our company will be suitable all people. Now we are going to make an introduction about the LEED-AP-BD-C study materials from our company for you. We sincerely hope that our study materials will help you achieve your dream.
LEED-AP-BD-C Questions Answers: https://www.dumpsfree.com/LEED-AP-BD-C-valid-exam.html
P.S. Free 2025 USGBC LEED-AP-BD-C dumps are available on Google Drive shared by DumpsFree: https://drive.google.com/open?id=1Lf9BYSdO3u8Sr8JhL9m5NcizOu5pjLOj